AI infrastructure, made physical.

Technology / Pod 32

The infrastructure is the machine.

Compute, networking, cooling, and power. Designed together as a factory-built module, with dedicated bare-metal access to the cluster.

Illustrative Pacific compute pod design study
Pacific / Modular infrastructure / Design study
01

System architecture

A closer look at the whole system.

A GPU cluster depends on the systems around it. Pacific brings those systems into a repeatable module, then confirms the configuration against the workload and the site.

The interactive model below is an illustrative design study. The reference specification and the agreed engineering plan define the deployment.

PACIFIC / MODULAR AI INFRASTRUCTUREIllustrative design study
Illustrative Pacific pod overview render

One machine. Every system.

Compute, cooling, and power distribution, designed together. A factory-built module replaces the complexity of a one-off construction project.

Integrated by design
02

Compute + fabric

Dedicated hardware. A deliberate configuration.

Pod 32 is built around 32 Supermicro HGX B300 nodes and 256 NVIDIA B300 GPUs. Single-tenant bare metal gives the workload a dedicated physical cluster.

Rail-optimized 400G Ethernet connects the system. Fabric configuration is chosen with engineering, with measured NCCL criteria included in the acceptance program.

Compute
32 Supermicro HGX B300 nodes
GPUs
256 NVIDIA B300
System memory
128 TB
Storage
983 TB raw NVMe per module
Fabric throughput
Configurable 3.2 or 6.4 Tbps per node
Design study showing compute racks inside the Pacific pod
02 / Compute and network architecture Illustrative design study. Written specifications govern.
03

Thermal + electrical

Density starts with the supporting systems.

Direct-to-chip liquid cooling and redundant coolant distribution units are part of the reference design. There is no site water requirement.

Reference operating load
645 kW
Rack count
4
Cooling
Direct-to-chip liquid, redundant CDUs
Site inputs
Prepared pad and power feed
Explore the fit for owned hardware
Illustrative detail of the pod's cooling systems
03 / Integrated thermal management Illustrative design study. Written specifications govern.
04

Acceptance

The specification is only the starting point.

The 24-stage factory, site, and integration test program produces witnessed acceptance evidence. Defined gates include measured NCCL fabric-performance criteria, so handoff is grounded in recorded results.